STRAND BRIDGE HOUSE - ALDWYCH - LONDON

Strand Bridge House has undergone a major refurbishment, completed to the highest specification featuring a comprehensively remodelled facade with an extended reception. The building delivers light, attractive, efficient floors with extensive window frontages. We were appointed by the principle contractor Keyshell to divide the 2nd & 3rd floor in to two halves to enable the building to be more attractive to new tenants. This involved the installation of a new dedicated split load distribution board from Schneider Electrical Loadcentre Range & new check meter, via a new 3 phase sub-mains supply & feed from new 100amp tap off unit from the existing rising busbar on the east side of the building. Tracing & diverting all lighting, small power, fire alarm & access control system together with relocation of the above items to enable the 50/50 split. The existing CP Electronics lighting control system, was reconfigured & commissioned to suite the new layout of the floor for new tenant’s flexibility.